Construction Security

Construction Site Security in Seattle, WA

In Seattle, construction site security is used on building projects in the city’s Regional Centers, including Downtown, South Lake Union, Uptown, Capitol Hill/First Hill, the University District, Northgate and Ballard. Officers control gates, patrol fenced perimeters and record conditions during nonworking hours, when partly built structures, stored materials and equipment are left unattended.

See the Seattle page for every security service in Seattle, or the Construction Site Security overview for how this service works.

Where Construction Site Security Is Used in Seattle

Typical posts include new multistory buildings, demolition sites, building alterations and contractor staging yards. The Seattle Fire Code calls for a fire watch during nonworking hours on new construction taller than 40 feet, and it allows fire watch and site security duties to be combined on the same post. In the Regional Centers named in the city’s comprehensive plan, which are home to a significant share of Seattle’s residents and workers, construction sites can sit beside occupied offices, homes and busy sidewalks, which makes gate control and perimeter checks important at every hour.

  • Downtown
  • South Lake Union
  • Capitol Hill/First Hill
  • University District
  • Northgate
  • Ballard

Construction Site Security Considerations in Seattle

Seattle’s noise rules limit construction noise to 7 a.m. to 10 p.m. on weekdays and 9 a.m. to 10 p.m. on weekends and holidays unless a noise variance has been issued. Security coverage is therefore heaviest outside those windows, after crews leave and the site is closed. Post Orders set the patrol frequency, the gate and key procedures for each shift and the steps to follow when an approved variance moves work into the evening, so coverage changes with the work schedule.

The Seattle Department of Construction and Inspections treats November 1 to March 31 as the rainy season, when grading in landslide-prone areas requires a grading season extension and grading can be limited on projects with a lot of earthwork. These limits can leave excavations, stockpiles and equipment in place for longer periods. Patrols during these months typically include checks of fencing, covered materials and erosion controls, with conditions recorded in the shift report for the general contractor.

Under the Seattle Fire Code, the owner designates a site safety director who maintains a written site safety plan covering site security, emergency reporting and fire department access routes. Where guard service is provided, guards are to be trained in notifying the fire department and management, the operation of fire protection equipment, site fire hazards and the use of construction elevators. Post Orders are written to match the site safety plan, including the locations of extinguishers, standpipes and fire hydrants.

Security Guard and Construction Fire Watch Rules in Seattle

In Washington, private security guards are licensed by the Department of Licensing. RCW 18.170.105 requires guards licensed since July 1, 2005 to complete at least eight hours of preassignment training, eight hours of initial postassignment training and four hours of annual refresher training, and companies must keep training records. Armed security guards must be at least 21 and hold a current firearms certificate issued by the Washington State Criminal Justice Training Commission. Chapter 33 of the 2021 Seattle Fire Code, enforced by the Seattle Fire Department, sets fire watch and site security rules for construction and demolition. Post Orders for these posts are written to reflect the applicable requirements.

Screening, Training and Supervision

Officers complete a five-stage screening process and tier-based training before assignment, including de-escalation and incident documentation. Supervisors make unannounced site visits, and the McCray Operations Desk answers 24/7/365. Incidents are documented on scene, and clients receive reports in the same format at every location.

Related Services in Seattle

Common Questions

When Does the Seattle Fire Code Require a Fire Watch on a Construction Site?

Chapter 33 of the 2021 Seattle Fire Code calls for a fire watch during nonworking hours for new construction taller than 40 feet above the lowest adjacent grade, for new multistory construction larger than 50,000 square feet per story, or where the fire code official requires it. A fire watch is also required during hot work and for at least 30 minutes after it ends. The code allows fire watch and site security duties to be combined.

How Does Seattle’s Rainy Season Affect Construction Site Security?

The Seattle Department of Construction and Inspections treats November 1 to March 31 as the rainy season and can restrict grading during those months, especially in landslide-prone areas. Slower earthwork can leave open excavations, stockpiles and equipment on site for longer periods. Patrols in these months can include added checks of fencing, covers and erosion controls, with conditions noted in each shift report.

How Is Coverage Priced?

Rates depend on the officer classification, hours, schedule and site requirements. McCray provides a written rate schedule after reviewing the needs of each site. Holiday, overnight and short-notice coverage is billed at a premium rate.

Request a Security Assessment in Seattle

Call (833) 832-6647 or request an assessment online. See the Seattle page or view all service areas.