Construction Security

Construction Site Security in Calgary, AB

Construction site security in Calgary covers active projects in Downtown Calgary, in East Village, where new residential and hotel buildings are under way, and in the Culture + Entertainment District around Scotia Place. It also extends to station and track work along the Green Line southeast segment and to developing edge communities such as Glacier Ridge, where open lots, stored materials and equipment sit unattended after hours.

See the Calgary page for every security service in Calgary, or the Construction Site Security overview for how this service works.

Where Construction Site Security Is Used in Calgary

In Calgary, construction security is used on mid-rise residential, hotel and mixed-use projects in East Village, on office-to-residential conversions in the downtown, and on venue, hotel and infrastructure work in the Culture + Entertainment District in east Victoria Park. Further out, it covers phased home building in new communities such as Glacier Ridge, Belvedere, Keystone Hills and South Shepard, and linear work sites along the Green Line southeast segment through Ogden, Quarry Park and Shepard, including station sites and the Shepard maintenance and storage facility.

  • Downtown Calgary
  • East Village
  • Culture + Entertainment District
  • Ogden
  • Quarry Park
  • Glacier Ridge

Construction Site Security Considerations in Calgary

The Calgary Fire Department requires a fire safety plan for buildings under construction or demolition, including single-family residential projects, and the plan must be accepted in writing before work starts. Hot works call for their own hot works fire safety plan. The owner, developer or contractor remains responsible for the plan until full occupancy. Post Orders for Calgary sites are written around the accepted plan, with patrols checking that hydrants and standpipe connections are clear, extinguishers are in place, combustible debris is reported and emergency access stays open.

The City’s practical guide for construction sites, drawing on the Alberta Building Code, calls for fencing, boarding or barricades at least 1.8 metres high, with gates kept closed and locked whenever the site is unattended, and for adjacent sidewalks to stay clear. Noisy work is restricted from 10 p.m. to 7 a.m. Monday through Saturday and from 10 p.m. to 9 a.m. on Sundays and statutory holidays. Officers on overnight and holiday posts record gate status, fence damage and any vehicles blocking site access.

Stampede Park is a short walk from downtown, and the Calgary Stampede runs for 10 days each July, with a parade that draws large crowds and stops downtown traffic. Sites in the Culture + Entertainment District, East Village and the downtown should plan delivery windows and gate control around the festival. In winter, Post Orders can add checks on temporary heating, winter enclosures and covered materials, and patrol routes can be adjusted for shorter daylight hours.

Security Licensing Rules in Alberta

In Alberta, security guards and other security service workers must be licensed under the Security Services and Investigators Act. Applicants must be over 18, be eligible to work in Canada, be fluent in English and have no criminal record. They must complete the Alberta Basic Security Training Course or the Accredited Basic Security Training Course and score 80 percent or higher on the provincial final exam, or hold a valid licence from another Canadian province or territory. Licences are valid for two years, and carrying a baton requires employer approval and an approved 40-hour use-of-force course. Post Orders for these posts are written to reflect the applicable requirements.

Screening, Training and Supervision

Officers complete a five-stage screening process and tier-based training before assignment, including de-escalation and incident documentation. Supervisors make unannounced site visits, and the McCray Operations Desk answers 24/7/365. Incidents are documented on scene, and clients receive reports in the same format at every location.

Related Services in Calgary

Common Questions

Does a Calgary Construction Site Need a Fire Safety Plan Before Work Starts?

In most cases, yes. The Calgary Fire Department applies the National Fire Code (Alberta Edition), which requires a fire safety plan for buildings under construction or demolition, accepted in writing before work begins, with projects under $5,000 exempt. McCray writes Post Orders around the accepted plan so patrols check the items it lists.

Can Construction Security in Calgary Cover Only Nights, Weekends and Holidays?

Yes. Coverage is often scheduled for the hours after trades leave, when the Alberta Building Code requires gates through site barricades to be closed and locked if the site is unattended. Officers carry out gate checks and perimeter patrols and file written reports for the site superintendent.

How Is Coverage Priced?

Rates depend on the officer classification, hours, schedule and site requirements. McCray provides a written rate schedule after reviewing the needs of each site. Holiday, overnight and short-notice coverage is billed at a premium rate.

Request a Security Assessment in Calgary

Call (833) 832-6647 or request an assessment online. See the Calgary page or view all service areas.